Every light, socket and switch, agreed before we build
Before first fix, every light, socket and switch is agreed with you on a plan and 3D view, and signed. Included in every VATRA price, once you have signed.
- Positions only
- Your designer approves changes
- Compliance items fixed
- Up to two rounds of changes
How the sign-off works
It is a sign-off record, based on your architect’s or lighting designer’s drawing where there is one, or on your approved drawings. We go through every position with you, with up to two rounds of changes, and you sign it off. Any change goes to your designer for approval before first fix. Smoke and heat alarms and other compliance items are shown as fixed: their positions are set by your designer or electrician for compliance. Our site team builds to it. Positions only: circuit design and compliance stay with our electrician, registered with a Part P competent person scheme. Anything that runs under the floor, such as sockets in a kitchen island, is agreed before the screed goes down.
It is the last step of your VATRA Studio walkthrough, once you have signed. Explore the example below. On your project, we mark up your layout and make every change with you at the walkthrough.
Architect or designer? You approve the layout, and any change to it, before first fix. We mark up; we don’t design. If the designer is not appointed for the build, we tell the client in writing which changes need design input before we build them. Tender Desk
Pick an item, then tap the plan to place it. Drag anything to move it; items on walls snap to the nearest wall. Distances to the walls show in millimetres. Smoke and heat alarms, the consumer unit, extract fans and the EV charge point are fixed and can’t be moved. With a keyboard: press Tab to reach an item, then use the arrow keys to move it (Shift for bigger steps) or Delete to remove it. The Schedule tab lists every position.
Drag to turn, pinch or scroll to zoom, two fingers to move. Tap a room above to fly to it. “Lights on” shows roughly where each light falls.
How the sign-off works
This layout records your choices. It doesn’t replace your architect’s or designer’s drawings, which take precedence, and the 3D views are illustrative. Our electrician, registered with a Part P competent person scheme, checks every position against the wiring regulations (BS 7671) and Building Regulations. If anything has to move, we tell you first. Changes after sign-off are agreed in writing, with the price, before they are made.
See your own home planned this way
Every client who goes ahead with us gets a Layout Sign-Off based on their own drawings, included in the price once they sign. See how the VATRA Studio walks you through your build
Example house for illustration only. For each client, walls are traced from their architect’s or designer’s scaled drawings, which remain the property of their authors. Room sizes are inside measurements, rounded to 0.05 m.
In this example, lights are spaced evenly across each room and heights are this example’s. On your project, positions, spacing and heights follow your designer’s drawings and specification, and the Building Regulations heights that apply. Smoke and heat alarms, the consumer unit, extract fans and the EV charge point are fixed: their positions are set by your designer or electrician for compliance and are not moved at sign-off. Furniture is shown for scale only.
Layouts show agreed positions only and are indicative; all dimensions to be checked on site. Kitchen appliance outlets are confirmed against the kitchen designer’s final layout. CCTV, alarm and AV/data positions are confirmed with the specialist installer.