Builders in Hendon, Golders Green and Colindale
Extensions, loft conversions and remodels that make room for a growing household across NW4, NW11 and NW9, priced line by line against your drawings and run by the two directors.
Room for a growing household
Across Hendon and Golders Green, the most common reason to build is simple: more space for a busy household. Extra bedrooms, a larger kitchen and dining area for family meals and guests, a second bathroom, a quiet room to work. The aim is usually to stay in a neighbourhood people love rather than move away from it.
The local mix of homes
Golders Green and the streets around it have many Edwardian and interwar semis and detached houses, often with substantial roofs that suit loft conversions. Hendon has a similar mix of early twentieth-century and interwar houses, along with later terraces. Colindale is different again: much of it is newer flats, with older semis and terraces in the surrounding streets.
Larger households often want the ground floor to work harder: a kitchen that can cater for a crowd, a separate utility or prep area, a downstairs shower room for older relatives, and bedrooms in the roof for teenagers. Typical projects include wraparound and rear extensions, loft conversions, two-storey side extensions where space allows, and full remodels that rework the ground floor around a larger kitchen.
Living with the work
Many families stay at home while the work goes on, so how the site is run matters as much as the finish. Before we start, we agree a week-by-week programme, so you know when the noisy stages are, when services will be off and when the kitchen will be out of action. Where dates matter to you, tell us at the start and we will plan the programme around them where we can.
Sites are kept secure and tidy, with dust and noise kept down, and you receive a written update every week. If a change is needed, it is agreed in a written Variation Order, with price and time, before it is built, so the programme does not slip without you knowing why. Where an architect administers the contract, changes come through the contract administrator’s instruction instead, with price and time agreed first wherever the contract allows.
When we hand over, you get 12 months’ aftercare for serious defects such as leaks, in addition to your legal rights, written into your contract, with a set process: we reply within one working day, deal first with anything affecting safety or letting water in, agree a date to put things right, and look over the work with you near month 12. Putting right faulty work is already your legal right; this is how we do it.
Barnet Council, party walls and structure
Hendon, Golders Green and most of Colindale fall under Barnet Council; parts of NW9 west of the Edgware Road are in Brent. Parts of the area sit within conservation areas, so check with the council or your architect before finalising a design. Your architect handles planning; we build to the approved drawings.
Most projects on semis and terraces come under the Party Wall etc. Act 1996, so notices must be served, and your neighbour must agree in writing or a party wall award be made, before that work starts; we work with your party wall surveyor where one is appointed. Every opening and steel is designed by a structural engineer, and temporary works are checked by our Temporary Works Coordinator before structural work begins.
Planning in Hendon and Golders Green: what to check first
Hendon and Golders Green are both in the London Borough of Barnet, so Barnet Council decides planning applications. Hendon has two conservation areas, Hendon Church End around the old village and St Mary’s Church, and Hendon The Burroughs, which has an Article 4 Direction removing some permitted development rights. Golders Green Town Centre is also a conservation area, made up mainly of shopping parades with flats above.
Many homes near Golders Green are in Hampstead Garden Suburb, which works differently from anywhere else in the borough. Freehold owners are bound by a Scheme of Management approved by the High Court in 1974, so external changes, garage conversions, significant garden works and tree work need consent from the Hampstead Garden Suburb Trust, and Barnet Council’s permission is needed as well. The Suburb is also covered by Article 4 Directions, including a separate one for the Spaniards End area.
If your home is in the Suburb, plan for two approvals rather than one. Your architect handles both applications; we start on site only once the approved drawings are in place.
Barnet Council: Article 4 Directions in Barnet (opens in a new tab)
How it works with us
- Send your drawings or book a site visit. A director visits, looks at access, neighbours and the existing building, and goes through your drawings or ideas with you.
- Your line-by-line price. Every item is priced against your drawings, with anything still undecided shown as a named allowance, and the price is agreed before you sign.
- Sign, then your VATRA Studio walkthrough. A written contract, a week-by-week programme and a payment schedule: a 5% deposit on signing, then you pay only as each stage of work is completed and signed off.
- Layout Sign-Off before first fix, weekly updates, stage sign-offs. Every change is agreed in writing before it is built, a director is on site at every key stage, overseeing the working site manager, and you get 12 months’ aftercare for serious defects such as leaks, in addition to your legal rights.
See your Hendon and Golders Green project built, before we start
Once you sign, we take you through how your home will be built, stage by stage, in the VATRA Studio: your approved drawings, what we check before anything is covered, when Building Control inspects, and what you pay at each step. Then every light, socket and switch is agreed with you on the VATRA Layout Sign-Off before first fix, with any change approved by your designer.
See an example, stage by stage See the Layout Sign-Off
The VATRA Studio presents your designer’s approved drawings. We don’t design: your designer and engineer are responsible for the design, we are responsible for building it to that design and to the Building Regulations, and Building Control checks the work independently. Stage timings are indicative. The Layout Sign-Off shows positions only; circuit design and compliance stay with our electrician, registered with a Part P competent person scheme.

Our local services
In NW4, NW11 and NW9 we offer home renovations and full remodels, house extensions, basements, loft conversions, bespoke new builds and outbuildings.
Nearby areas we also cover: Mill Hill and Edgware; Finchley; Hampstead and Hampstead Garden Suburb.
Homes built by Andrei Barote’s team under contracts agreed before VATRA was formed
Each one is labelled that way, with the borough only. When VATRA projects complete, we will show them here.
LONDON BOROUGH OF HARROWFull home renovation and extensionBuilt by Andrei Barote’s team, December 2025 to September 2026, before VATRA was formed.
LONDON BOROUGH OF HILLINGDONKitchen, bathrooms and finishesBuilt by Andrei Barote’s team, April to October 2026, under a contract agreed before VATRA was formed.
NEW BUILDA new home with a garden roomBuilt by Andrei Barote’s team before VATRA was formed.
FAQs
Can you plan the work around dates that matter to us?
Tell us at the start and we will build the week-by-week programme around them where we can, so the disruptive stages avoid the times you need the house.
We want a second kitchen or larger utility area. Is that something you build?
Yes, if it is on your drawings. We price it item by item like everything else, including the extra drainage, plumbing and electrics.
Will there be days without water or power?
Sometimes, when services are connected or moved. We show these days on the programme and warn you in the weekly update beforehand, so they do not come as a surprise.
Do you take on work in Colindale?
Yes, on houses in and around Colindale. Our focus is houses rather than flat refurbishments.
Do I need the Hampstead Garden Suburb Trust’s consent as well as planning permission?
Yes, if your home is in the Suburb. The Trust’s consent is needed for external alterations and some garden and tree work under the Scheme of Management, and Barnet Council’s consent is needed separately.
Is Hendon in a conservation area?
Parts of it are. Barnet has two Hendon conservation areas, Hendon Church End and Hendon The Burroughs, and The Burroughs has an Article 4 Direction. Your architect can check whether your address falls inside either one.
Send us your drawings or book a site visit in Hendon, Golders Green or Colindale, and we will prepare an itemised, line-by-line quote.
The VATRA Standard: an itemised, line-by-line price agreed before you sign; a director leading every project and on site at every key stage; every change signed before it’s built; stage payments for finished work; a weekly written update, with photos at key stages; 12 months’ aftercare for serious defects such as leaks, in addition to your legal rights; and insurance checked for each job and in place before work starts.
See it in writing: See a sample weekly update (PDF, opens in a new tab)