Home renovations and full remodels, run by the directors who price them

Have drawings? Send them for an itemised, line-by-line price. No drawings yet? We can introduce architectural designers we trust; you appoint them.

Kitchen with a stone waterfall island
London Borough of Harrow. Built by Andrei Barote’s team, December 2025 to September 2026, before VATRA was formed.

What a renovation or full remodel includes

A full remodel changes how a home works, not just how it looks. That can mean opening up a kitchen and living space, moving a staircase, reworking bathrooms, rewiring, replumbing, new heating, new floors, new windows and complete joinery, tiling and decoration.

We build to your architect’s or designer’s drawings and your structural engineer’s design, and anything unclear is raised in writing before it is built.

Where walls come out or openings are formed, temporary supports are designed by a qualified structural engineer, then checked on site and released for loading by Andrei, our Director of Site Operations and a qualified Temporary Works Coordinator, before any structural work begins.

See typical ranges in our home renovation cost guide.

How we price it

We work through your drawings and specification line by line, measuring and pricing every item rather than estimating. You get an itemised price, agreed before you sign, with provisional sums clearly marked. Renovations often hide surprises behind plaster and under floors, so anything we cannot price until we open up is listed as a provisional sum, then priced and agreed with you in writing before the work goes ahead, wherever the contract allows.

A 5% deposit on signing secures your start date. After that, you pay only as each stage of work is completed and signed off. Where your architect administers the contract, payment is against the architect’s certificates for completed work, with any deposit and retention as the contract sets. Every change is agreed in writing before it is built: on a VATRA Variation Order signed by you, with its price and time, or, where an architect administers the contract, through the contract administrator’s instruction, with price and time agreed first wherever the contract allows. Safety certificates for our work are built into the price, not added later.

What to expect and typical timescales

Before we start you receive a signed contract, a week-by-week programme and a payment schedule. Punit and Andrei personally oversee every project, from the first conversation to completion. A director is on site at every key stage, overseeing the working site manager. We take on up to four projects a year, depending on their size. You get a written update every week, photos at key stages, and each stage is signed off with you.

As a guide, a full remodel of a house typically takes around 30 to 32 weeks; for smaller renovations, your timescale is set out in the written programme for your job. These are guide ranges only. Your actual timescale depends on the size of the home, the drawings and the specification, and is confirmed in the written programme for your job.

Before practical completion we walk the snagging list with you against the drawings. After handover you get 12 months’ aftercare for serious defects such as leaks, in addition to your legal rights, with a set process: we reply within one working day, deal first with anything affecting safety or letting water in, agree a date to put things right, and look over the work with you near month 12. Putting right faulty work is already your legal right; this is how we do it.

THE VATRA STUDIO · ONCE YOU SIGN

See your remodel built, before we start

Once you sign, we take you through how your remodel will be built, stage by stage, in the VATRA Studio: your approved drawings, what we check before anything is covered, when Building Control inspects, and what you pay at each step. Then every light, socket and switch is agreed with you on the VATRA Layout Sign-Off before first fix.

See an example, stage by stage

The VATRA Studio presents your designer’s approved drawings. We don’t design: your designer and engineer are responsible for the design, we are responsible for building it to that design and to the Building Regulations, and Building Control checks the work independently. Stage timings are indicative. The Layout Sign-Off shows positions only; circuit design and compliance stay with our electrician, registered with a Part P competent person scheme.

An example rear extension in the VATRA Studio, shown stage by stage; yours would show your own renovation
Shown: an example rear extension, illustrative only. Your Studio shows your own renovation, from your approved drawings.

Planning, Building Control and party walls

Many internal renovations do not need planning permission, but changes to the outside of a home and homes in conservation areas can. Any work to a listed building, inside or out, may need listed building consent. We work with your architect or designer, who handles any planning application; we don’t submit planning applications ourselves.

Structural alterations, new drainage, electrics and thermal upgrades come under the Building Regulations. We book Building Control inspections at the right stages and photograph insulation and airtightness before they are covered. If your work is covered by the Party Wall etc. Act 1996, notices must be served, and your neighbour must agree in writing or a party wall award be made, before that work starts; we work with your party wall surveyor where one is appointed.

Areas we cover

Alongside home renovations and full remodels, we also build house extensions, basements, loft conversions, bespoke new builds and outbuildings, all to the same written standard.

We build across North London, North West London and South Hertfordshire, including Mill Hill and Edgware; Totteridge, Whetstone and Barnet; Finchley; Hampstead and Hampstead Garden Suburb; Highgate; Southgate; Enfield; Hendon, Golders Green and Colindale; Stanmore, Harrow and Pinner; Ruislip; Northwood; Radlett, Elstree and Borehamwood; Potters Bar; and Bushey and Watford. For projects outside these areas, we first check that we can run the site well.

FAQs

Book a site visit

Book a site visit with a director, or send us your drawings for an itemised, line-by-line quote with no obligation.

The VATRA Standard: an itemised, line-by-line price agreed before you sign; a director leading every project and on site at every key stage; every change signed before it’s built; stage payments for finished work; a weekly written update, with photos at key stages; 12 months’ aftercare for serious defects such as leaks, in addition to your legal rights; and insurance checked for each job and in place before work starts.

See it in writing: See a sample Variation Order (PDF, opens in a new tab)