Two-storey and side extensions, built to your drawings
Have drawings? Send them for an itemised, line-by-line price. No drawings yet? We can introduce architectural designers we trust; you appoint them.

What a two-storey or side extension involves
A side extension uses the space beside your house, often where a garage or side passage is. A two-storey side extension adds rooms upstairs as well, usually a bedroom or bathroom over a wider kitchen or utility room. A side return extension fills the narrow strip beside the back of a Victorian or Edwardian terrace.
A typical job covers foundations and drainage, the new walls, steels where the existing wall is opened up, the floor and roof structure, tying the new roof into the existing one, windows, then first fix, plastering and the full finish. Every steel and opening is designed by your structural engineer, and we build to that design.
Replacing a garage is common. The old garage comes down, the existing foundations and drainage are checked against your engineer’s design, and the new structure is built in its place.
How we price it
We price your drawings line by line, so you see what each part costs, from the foundations to the finishes. Two-storey work is priced with its scaffold, the roof tie-in and the making good inside the existing house, so none of it turns up later as an extra.
A 5% deposit secures your start date. After that, you pay only as each stage of work is completed. Any change is priced and agreed in writing before the work goes ahead.
Want a rough figure first? Our guide price calculator gives you a range in three quick questions.
What to expect on site
Side extensions are often built close to a neighbour’s boundary, so access, scaffold and deliveries are planned with you, and with your neighbour where needed, before we start. Most of the work happens outside until the new structure is weathertight. The opening into your house is usually formed later, to keep the disruption inside short.
You get a week-by-week programme, a written update every week with photos at key stages, and a director is on site at each key stage and checks it before it is covered. Your timescale depends on the size of the extension and is set out in your written programme.
See your extension built, before we start
Once you sign, we take you through how your extension will be built, stage by stage, in the VATRA Studio: your approved drawings, what we check before anything is covered, when Building Control inspects, and what you pay at each step. Then every light, socket and switch is agreed with you on the VATRA Layout Sign-Off before first fix.
See an example, stage by stageThe VATRA Studio presents your designer’s approved drawings. We don’t design: your designer and engineer are responsible for the design, we are responsible for building it to that design and to the Building Regulations, and Building Control checks the work independently. Stage timings are indicative. The Layout Sign-Off shows positions only; circuit design and compliance stay with our electrician, registered with a Part P competent person scheme.

Planning, Building Control and party walls
A single-storey side extension can sometimes go ahead under permitted development, but only if it is no wider than half the original house, no more than 4 metres high, and not in a conservation area. Side extensions of more than one storey, and most wraparound extensions, need planning permission. Your architect or designer confirms what applies and makes any application; we don’t submit planning applications ourselves.
Every extension needs Building Regulations approval. Work on or near a shared wall or boundary usually falls under the Party Wall Act, so notices must be served, and your neighbour must agree in writing or a party wall award be made, before that work starts. Our planning guide explains the main rules.
Homes built by Andrei’s team
Each of these was built under a contract agreed before VATRA was formed, and is labelled that way. Borough only, never an address.
LONDON BOROUGH OF BARNETRear extension, completed in 2026Built by Andrei’s team, January to August 2026, before VATRA was formed.
LONDON BOROUGH OF HARROWFull home renovation and extensionBuilt by Andrei’s team, December 2025 to September 2026, before VATRA was formed.
GARDEN ROOMRear extension, garden room and landscapingBuilt by Andrei’s team before VATRA was formed.
Areas we cover
Alongside two-storey and side extensions, we also build rear and wraparound extensions, home renovations and full remodels, basements, loft conversions, bespoke new builds and outbuildings, all to the same written standard.
We build across North London, North West London and South Hertfordshire, including Mill Hill and Edgware; Totteridge, Whetstone and Barnet; Finchley; Hampstead and Hampstead Garden Suburb; Highgate; Southgate; Enfield; Hendon, Golders Green and Colindale; Stanmore, Harrow and Pinner; Ruislip; Northwood; Radlett, Elstree and Borehamwood; Potters Bar; and Bushey and Watford. For projects outside these areas, we first check that we can run the site well.
FAQs
Almost always, yes. Only single-storey side extensions can be permitted development, and only within strict limits. Your architect or designer confirms what applies to your house.
Yes. It’s one of the most common side extensions. The garage comes down, the existing foundations and drainage are checked, and the new structure is built to your engineer’s design.
Usually not. Most of the work happens outside until the new structure is weathertight. The disruption inside comes when the openings into your house are formed and the new rooms are finished, and we plan that stage with you.
If the work is on or near a shared wall or boundary, it usually falls under the Party Wall Act. Notices must be served, and your neighbour must agree in writing or a party wall award be made, before that work starts.
Book a site visit
Send us your extension drawings or book a site visit with a director for an itemised, line-by-line quote.
The VATRA Standard: an itemised, line-by-line price agreed before you sign; a director leading every project and on site at every key stage; every change signed before it’s built; stage payments for finished work; a weekly written update, with photos at key stages; 12 months’ aftercare for serious defects such as leaks, in addition to your legal rights; and insurance checked for each job and in place before work starts.
See it in writing: See a sample line-by-line price (PDF, opens in a new tab)